Plan the Team Work
By the end of week one, your group of three should have a shared requirements draft, a reproducible guest cart bug report, a state map, and a reviewed as-is sequence diagram. Use those findings to plan the remaining experiments and report work.
1. Create a GitHub Project
One team member creates a new Board in GitHub Projects and gives all three members access.
Use these columns:
Add the project link to the repository README or another location the whole team can find.
2. Create issues from your analysis
Create GitHub issues for unanswered requirement questions, the remaining architecture experiments, testing analysis, diagram revisions, and report sections. Link related work to the guest cart bug issue. Each issue should contain:
- A short, action-oriented title.
- The observation or question being investigated.
- A checklist of completion criteria.
- The evidence that must be captured.
- Links to related issues or code when relevant.
Keep each issue small enough for one student to own and another student to review.
## Goal
Compare guest cart behavior in single and scaled modes.
## Done when
- [ ] Run the session demonstration in both modes
- [ ] Record status, instance marker, and cookie name
- [ ] Add the evidence to the report draft
- [ ] Ask a teammate to review the interpretation
3. Assign work to one another
Each student creates at least one issue and assigns it to a different teammate. Distribute the issues so all three students own implementation or investigation work and review someone else's work.
Do not divide the lab into isolated sections that only one person understands. Use issue comments, linked evidence, and reviews to share findings across the team.
4. Work from the board
- Move prepared issues from Backlog to Todo.
- Move an issue to In Progress when work begins.
- Limit each student to one in-progress issue at a time.
- Move completed work to In Review and request a teammate's feedback.
- Move the issue to Done only after its checklist is complete.
At each team meeting, review what moved, what is blocked, and what should happen next. Update the board as the plan changes.
Before continuing, confirm that:
- The project contains the remaining lab work.
- The requirements, bug report, and as-is sequence diagram are linked from the project.
- Every issue has clear completion criteria.
- All three students have assigned work.
- Every issue in progress has one owner.
Week 2 instructions will be released separately.